30069 LIRB LIRB 05553800 A 9/11/1997 8:00 REACH R downstream of the Starved Rock Lock and Dam Harris,Mitchell,Adolphson,Debbie,Fazio,D,Stammer,S Good Cool am. Dredgeing was being done DS of the Lock yesterday (09-10-97) in the barge channel. Large river site sampled using boat methods. Transects 2,3,4, and 5 actually only total two complete cross-sections. Transects 2 and 4 were in the main navigation Dredged 1330 Left Right Where the bedrock meets the concrete wall at the park The daymarker located just below the island across from the boat launch 4 Cool am. Dredgeing was being done DS of the Lock yesterday (09-10-97) in the barge channel. Large river site sampled using boat methods. Transects 2,3,4, and 5 actually only total two complete cross-sections. Transects 2 and 4 were in the main navigation 9/29/2000 21:39 7/2/2003 12:42